
The BSU Fume Hood consisted of the gut and upgrades of existing millwork and mechanical systems. It also incorporated the setting of a large exhaust fume hood system onto a five-story roof. Millwork and epoxy counter tops for the labs were also included.
The Boise State Greenhouse is a state of the art 2,079-sqft greenhouse with four independently controlled climatized growing areas, a head house, and the building is all aluminium with dual glazed glass. All sections are climatically controlled by computer interface which ties into a roof top weather station.
The Boise State Labs projects consisted of the complete gut of an existing 1,330-sqft lab facility. Construction included three fume hoods, laboratory case work, epoxy counter tops, air gas, and deionized water, as well as, acid drainage.
The Liberal Arts project was the complete gut and remodel of lecture hall room 106. The job entailed the reconfiguration of existing slope and staged floor, as well as, the installation of theater class seating. Wall paneling and suspended cloud ceiling décor were added, along with audio, visual, and lighting controls.




